My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07517
DRMS
>
Back File Migration
>
Report
>
REP07517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:41 PM
Creation date
11/26/2007 11:38:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Report
Doc Date
6/28/1995
Doc Name
QUARTERLY INSPECTION REPORT EXTENDED COAL PROCESSING WASTE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />ENERGY FUELS MINING CO. <br />RATON CREEK MINE <br /> <br />QUARTERLY INSPECTION REPORT <br />EXTENDED COAL PROCESSING WASTE <br />DATE OF INSPECTION: June 27,1995 <br />IDENTIFICATION: Extended Waste Disposal Area <br />LOCATION: Sec. 36, R64W, 6th P.M. <br />Las Animas County, Co. <br />COMMENTS: Some rills have appeared, due to the heavy recent rains. <br />The slopes are well saturated with moisture. Information recieved <br />was that contractor was to move in to seed & mulch the area, but <br />due to the heavy rains it is impossible to do this work. <br />Areas with good topsoil shows good wild vegetation growth..thru-oat, <br />while the less topsoiled area does show vegetation growth but not <br />nearly as much. Recommendation was made by this firm to test the <br />area if accepted without additional topsoil, but have not received <br />any information. <br />Gabion Wire ditch does not show any water runoff. Bales of straw <br />were placed along the Gabion ditch (high side) at the steeper slope <br />areas. These bales will check the possible erosion under the Gabion <br />wie basket. In due time the silt will fill in between the hill slope <br />and the wire basket, thus allowing water runoff onto the basket and <br />not undermine it. <br />RECOMMENDATIONS: Monitor the rill erosion. Do not proceed with the <br />seeding and mulching contract until the Fall or Spring quarter. <br />Monitor the Gabion ditch for any undermining. <br />PROFESSIONAL ENGINEERS STATEMENT: <br />report was prepared hereon is true <br />knowledge and information. <br />C-.2 ~-9,Y <br />Date <br />I, John H. Bacich state that this <br />and correct to the best of my <br />" ohn H. Bac'c <br />olo. P. E,. 9869 <br />Y . .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.