Laserfiche WebLink
l <br />iii iiiiiiiiiiiii iii <br />sss <br />QUARTERLY INSPECTION REPORT ~-- <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Mine <br />Date: <br />Waste B, <br />R/P_ w ~/~ <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />1~New Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />^ Placement of Underdrain(sl' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />andlordischarge,integrity of 100-year 24-hourappurtenant drainage structures, evidence of positive <br />drainage. /~ <br />- No SPr;n95 o r' Q r~S ~7- 4G7~i t/~e .S!c~QS' e G+/c ~ <br />obs Ea-1,~1. <br />_ SI'b4 (~ 4~q 6 ~`' ~^~lr'o~ hrq 7~tr hr4t o ~S~rvv~ ~^ t~+~- <br />7~P Y~rrQCe in ~e e~~Me wesye~^ cor.,cr'. <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />- Son c ; ~ e grodri~ ~i~d /'ec~~tly ~,~^ P~oce y-o <br />I^~-es~b l;s~, ~;vcrs;o~ c~v~.+P~s, erc. o•t ~e Abp ~rRacr- <br />F,/l 4~1ov.tys q~pesf- y~ be /hi~:.~c/. <br />Tile o~r4,~ `o%~~ 7'~e Cos~~cx lrp~ Dem., r~,•,o~ 4•,~ ,s <br />CGtfrYvl~y bGin~ fL°-C~OnS~r"4G~Cc+~. <br />X03 ) o Z8~ )~o <br />