My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07494
DRMS
>
Back File Migration
>
Report
>
REP07494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:40 PM
Creation date
11/26/2007 11:38:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Report
Doc Date
12/16/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />active mining area. Reclamation began <br />area with topsoiling and reseeding of <br />on the north edge of the pit. <br />i <br />at the active mining <br />a depleted slope area <br />Reclamation efforts in the old mine area during 1993 <br />continued with backfilling and regrading of highwalls mined <br />prior to 1990. Work was completed on backfilling and <br />regrading the last area mined during 1990. Topsoil was <br />replaced on approximately 1.4 acres of this area and <br />reseeding was accomplished. An area of approximately one acre <br />directly south of the former highwall escarpment was seeded <br />again in 1993. This area had been reclaimed and seeded in <br />1991 but revegetation results from the first seeding were <br />unsatisfactory. <br />The portion of Eagle County Road #51 which serves as a <br />haulroad was treated with dust suppressant during the summer. <br />Roadbase material was replaced on worn areas of the road at <br />that time. Work was also accomplished in widening the narrow <br />road sections at the double curves overlooking Interstate 70. <br />Fill material from those narrow sections was used to <br />straighten an ess curve road section just above the #1 Mile <br />Marker. Material from the double curve cut was also used at <br />the hairpin curve just north of Interstate 70 where the road <br />section was realigned thru the location of the old, decayed <br />stage coach bridge. <br />This project will be completed in the Spring of 1994 with <br />final grading and resurfacing of the new road sections. The <br />former hairpin curve section will also be reclaimed at that <br />time with resloping backfill, a layer of topsoil and <br />reseeding. <br />A total of approximately 336,000 tons of gypsum rock were <br />shipped from the mine during 1993. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.