<br />According to C.R.S. 34-32-I 16(3)
<br />the operator shall submit a report t
<br />reclamation accomplished to date
<br />during the upcoming year, and
<br />a report and map to enclosed a
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />
<br />nd C.R.S. 34-32.5-I 16(3)(x), on the anniversary date of the permit each year,
<br />I a map showing the extent of current disturbances to affected land,
<br />i during the preceding year, new disturbances that are anticipated [o occur
<br />nation that will be performed during the upcoming year. Please attach such
<br />report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for written report.)
<br />If your operation is subject u~ the pr visions of Temporary Cessation as defined in the Act and Rules, you must
<br />' provide with the Annual Report the ollowing information as required by 2 CCR 407-1, 407-4, and Rules
<br />L13.7(I)(a):
<br />(i) the condition of [he
<br />(ii) what specific measures
<br />standards and Environmental Protet
<br />' (iii) plans for resumption
<br />Please provide the additional folb
<br />(a) Per the requirements
<br />regarding the sufficiency
<br />(i) Per the
<br />statement regardir
<br />I irrevocable letters
<br />credit, and first pr
<br />at the time of cessation;
<br />been and will be implemented to comply with reclamation, performance
<br />Plan requirements, if they are pan of your approved application: and
<br />mining operations.
<br />information with your Annual Report, as applicable:
<br />2 CCR 407-I, 407-4, and Rules 1.15(1), provide an updated statement
<br />the value of the Financial Warranty, specifically:
<br />tents of 2 CCR 407-1, 407-4, and Rules 1.15(1)(x), provide an updated
<br />the sufficiency of the value of the financial warranty. Specifically,
<br />'credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />liens on project related fixmres.
<br />(ii) Per the require ents of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a ecuriry Agreement, the operator shall submit an update, by a qualified
<br />independent apprai er, indicating any changes in property value, and a statement summarizing
<br />any circumstances hich may affect the adequacy of the Deed of Trust, or Security agreement,
<br />-+ ~ and~}t ie value o~ th property su-bject t-o ether of these instruments. The report sfiall also provi e
<br />proof that there are no past-due property taxes.
<br />I (i) Per the requite ents of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />I Irrevocable Letter f Credit, the operator shall have the bank provide documentation in the form
<br />~ of a ba]ance sheet, ertified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not ex ed ten percent (10%) of the bank's capital surplus accounts.
<br />(ii) Per [he require ents of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />' Priority Lien on an fixtures and Equipment, the operator shall provide a report in sufficient
<br />~ detail to fully desc be the condition, value, and location of all pledged fixtures and equipment.
<br />i (b) Per the requirements of~ CCR 407-1, 407-4, and Rules I.15(1)(c), all monitoring information
<br />required as pan of the appr ved permit application, to include the Environmental Protection Plan. (Please
<br />note that if you are not a D signaled Mining Operation, you will not have an Environmental Protection
<br />Plan as part of your approv~d permit.)
<br />
|