My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07332
DRMS
>
Back File Migration
>
Report
>
REP07332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:34 PM
Creation date
11/26/2007 11:35:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
Report
Doc Date
2/26/1998
Doc Name
LAKEWOOD BRICK AND TILE CO CHURCH PIT ANNUAL REPORT MLRB PN M-79-045 ANNIVERSARY DATE 2/28/96 FEDERA
From
LAKEWOOD BRICK AND TILE CO
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' THE LA ~ OOD BRICK AND TILE~OMPAN III III III IIIIIII III <br />Alanuletturero Ot • FACE 8 PAVING BRICK • SPECIAL SHAPES 8 THIN BRICK VENEER <br />OFFICE AND YARDS: 1325 JAY STREET <br />LAKEWOOD, COLORADO 802142052 • TELEPHONE (303) 238.5313 <br />FA% (303I 237-7737 <br />February 26, 1998 <br />Mr. Carl Mount <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Mrs. Chiappone: <br />Re: Lakewood Brick and Tile Co. <br />Church Pit, Annual Report <br />MLRB Permit # M-79-045, <br />Anniversary Date 2/28/96 <br />FEDERAL TA% ID. # 84-0247850 <br />~ec1 151~> <br />c~; OZo ~~L <br />RECEIVED <br />'.'1"1 l` ~~ rn~ <br />Division of Minerals 8 Geology <br />Our files indicate that the anniversary date for this permit <br />is February 28, 1998. This mine currently produces two materi- <br />als, brick clay & sand and gravel each are mined by different <br />operators. This pit HAS NOT been granted a Temporary Cessation <br />and it HAS operated more than 180 days this year. The approved <br />bond amount is $27,000 covering 75.74 acres ±, and the facility <br />has seven mining and reclamation phases. However, the current <br />bond amount in the Divisions possession is $40,000. Please refer <br />to the Annual Report Map attached for the areas discussed in this <br />text. <br />We will deal specifically with the Annual Report require- <br />ments as outlined in Rule 1.15 of the Rules and Regulations and <br />those noted in the annual letter. <br />(1) Clay - No new area was disturbed by the clay mining opera- <br />tion this year. We continued to mine deeper on the land <br />previously disturbed (yellow), including the area stripped <br />of gravel (dark blue). Approximately 21.37 acres is dis- <br />turbed by the clay operation in Stages O, I and II. This <br />included the old clay mined area (aqua) on the south and the <br />Clay Plant site (pink). The clay face was advanced to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.