Laserfiche WebLink
ANNUAL REPORT • <br />INSTRUC'T'IONS ' <br />According to C.R.S. 34-33-I f 6(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the permit each year. <br />the operator shall submit a report and,a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and during the preceding yeiu: new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report J <br />If your operation is subject to [he provisions of Temporary Cessation as defined in the .4ct and Rules, you must <br />provide with the Annual Repott the following information as required by 2 CCR 407-1, 407-4, an<i Rules <br />1.13.7(1)(a): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, i F they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regazding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(])(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, ;tnd security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.15(1;)(b), permits secured with ;. <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of [he Deed of Trust, or Security ae Bement, <br />and the value of the property subject to either of these instruments. The report shall also provide <br />_ proof that there aze no past-due property taxes: <br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the fomt <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (10°10) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of al! pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules I. ] 5(I)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note [hat if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />