Laserfiche WebLink
• <br /> <br />David C. Shelton <br />Director <br /> <br />June 1, 1982 <br />S TATF CFCGLOFAGO °'C~+«CC l<•n.i Oc. =.. ,r <br />s • III III III IIIIIII III <br />DEPARTMENT GP NATURAL RESOURCES 999 <br />D Monte Pascoe. c.ecuu ve Director <br />MINED LAiND RECLAMATION <br />423 Centennial Building, t313 Sherman Street <br />Denver, Colorado 60203 Tel. (303) 866-3567 <br />Jack Hurlburt <br />Mobile Premix Concrete, Inc <br />P.O. Box 5183 TA <br />Denver, Colorado 80217 <br />Re: File N78-52 <br />~2 <br />C~ ~c•5~ / <br />Based upon ovr records, the anniversary date of your mining operation permit is <br />June and annual fees for the year(s) 1982 totalling <br />$ 356.00 are due on that date. Fees are based upon a schedule of <br />$350.00 if the operation is an open mining operation of IO acres or more and <br />$275.00 for any other operation 10 acres or more. <br />Also, to bring the Division up to date as to the Wining and reclamation on the <br />site, please submit a report and map (to a scale of not Less than I00' to the <br />inch and rot more t'~an 660' to the inch), indicating the phases of t,'-,e reclama- <br />tion plan which have been completed, correlated toith the timetable. the report <br />and mao shall contain the following information: <br />1) Location and number of acres affected during that year, <br />2) Locations and nu;rtber of acres reclaimed for that year, <br />3) T,he location and number of acres in the various stages of reclamatior. <br />(backfilled, graded, topsoil replaced, revegetated), <br />4) The species o: vegetation planted, the locations and aporo:rimate dates <br />of planting, <br />5) The type and appro::imate Quantity of fertilizers, organic material or <br />soil conditioners used and location of use, <br />o`) An appraisal of t5e success of reclamation efforts, and in the event <br />of failure of any efforts, a short rarrat_'ve on the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in t5e <br />coming year, and <br />8) The effective date of the informatior. provided above shall be no mere <br />than 45 days prior to the anniversary date. <br />~t <br />