<br />ANNUAL REPORT
<br />INSTRI7CTIONS
<br />
<br />Accordoig to C.R.:i. 34-32-1 l6(3), and C.R.S. 34-325~116(3)(a), on the anniversary date of the permit each. year,
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land,
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to oce:ur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach ~;uch
<br />a repott and map u> enclosed annual repott form. (An adequately labeled map that clearly delineates and incaudes
<br />the above elemzn[s ma}• suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407, and Rules
<br />1.13.7(1)(a):
<br />(I) the condition of dte operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemen[ed to comply with reclamation,
<br />performance standards and Environmental Protection Plan requirements, if they aze pan of your
<br />approved application; and
<br />(iii) plans for resumption of minim operations.
<br />Please provide the. additional following information with your Annua! Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />regazding the sufficiency of the value of the Financial Warranty, specifically:
<br />(]) Per the requirements of 2 CCR 40'1-1, 407-4, and Rules 1.15(1)(al, provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a sta[ement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreemen[,
<br />and the value of the property subject to either of these instruments.
<br />The report shall also provide proof that there are no past-due property taxes,
<br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with :tn
<br />Irrevocable Letter of Credit, the openttor shall have the bank provide documentation in thc: form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the
<br />1_etter of Credit does not exceed ten Irercent (10%) of the bank's capital surplus accounts.
<br />ivi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures- and Equipment, the operator shall provide a repott in sufficient
<br />derail to fully describe the condition, value, and location of a!] pledged fixtures
<br />+urd equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as pan of the approved permit application, [o include the Environmental Protection Plan.
<br />(Please [tote that if you are not a Designated ~lininq Operation, you will not have an Environmental
<br />Protection Plan as part of your approved permit.)
<br />
|