Laserfiche WebLink
Snowcap Coal Company, Inc. - 6 - 2003 Annual Reclamation Report <br />19. Cameo Refuse Disposal Area No. 2 -The final reclamation of this refuse <br />pile included covering and topsoiling the upper benches and the top of the <br />pile. Also a new diversion ditch was constructed just above the pile. The <br />Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Located in the SE'/<, Section 28 and <br />the SW/<, Section 27, Township 10 South, Range 98 West, 6"' P.M. <br />Area - 19.8 acres <br />Date -April 2002 for CRDA2 and November 2002 for Upper Diversion <br />Seed Mix -For CRDA2 see attached "Seed Mix, Exhibit E", Upland <br />Components <br />Seed Mix -For Upper Diversion see attached "Seed Mix, Exhibit F", <br />Upland Components <br />20. Cameo Borrow Area No. 2 -Material was excavated from CBA2 for the <br />covering of the CRDA1. Approximately 5.1 acres was seed in April 2002, <br />however a further disturbance will be needed here at the removal of Pond <br />11. Located in the SE'/<, Section 28, Township 10 South, Range 98 West, <br />6`" P.M. <br />Area - 2.7 acres <br />Date -April 2002 <br />Seed Mix -See attached "Seed Mix, Exhibit E", Upland Components <br />21. Access Road and Powerlines to No. 2 West Portals - By agreement <br />with the Bureau of Land Management, the access road was left in place. <br />The Powerline reclamation was finished during 2002. <br />Area - 3.8 acres <br />Date -July 2002 <br />Seed Mix - No seeding required <br />22. Roadside North Portal Mine Facilities and Stockpile Area -All <br />structures, materials and facilities were removed. The portal decline was <br />filled and the area was returned to approximate original contours and then <br />reseeded. Located in the SW'/a Section 27, Township 10 South, Range <br />98 West, 6`h P.M. <br />Area - 24.8 acres <br />Date -November 2002 <br />Seed Mix -See attached "Seed Mix, Exhibit F", Upland Components <br />Approximately .1 Acres along the north bank of Coal Creek was reseeded <br />after it was re-disturbed creating access for equipment while building the <br />rock check structure in Coal Creek. <br />Date -August 2003 <br />Seed Mix -See attached "Seed Mix, Exhibit F", Upland Components <br />