Laserfiche WebLink
Daniels Sand Pit <br />2004 Annual Report <br />Transit Mix Concrete <br />M-1973-007-SG <br />Overview of Permit Year: Over the year mining continued steadily in phase 4E. <br />Annual Report Maps: This year's annual report map will actually be a labeled aerial <br />photograph. This is the easiest way to describe the site. <br />Activity: Mining continued steadily throughout the year. Material extraction <br />progressed southward and eastward. The N-S trending topsoil stockpiles next to the <br />permit boundary have been relocated. The piles now form one long E-W trending <br />pile along the southern boundary of phase 4E. The topsoil stockpiles were moved in <br />order to maximize mining. This land has been stripped and ready for mining. <br />Reclamation: Last year I indicated that a drip line was going to be installed next to a <br />line of trees in the southern portion of phase 3E. This didn't happen and won't <br />happen in the foreseeable future. No new reclamation occurred last year as pit edge <br />zones are still involved in some stage of active mining. <br />Expected Activity (2003): Mining wIll (mainly) continue to push further east into <br />phase 4E. The relocated stockpiles will seeded in the following year. <br />Bonding: This operation is covered by a corporate bond. <br />