My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07097
DRMS
>
Back File Migration
>
Report
>
REP07097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:24 PM
Creation date
11/26/2007 11:31:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981058
IBM Index Class Name
Report
Doc Date
9/15/1982
Doc Name
ANNUAL FEE DEBEQUE PIT FN 81-58
From
MLR
To
UNITED SAND & GRAVEL CO
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mining Plan (continued) <br /> <br />The mining operation will onsist of the following ases: <br />1. Removal and stocky ling of topsoil. Tops it will be stripped <br />with scraper and do rs. Topsoil remove from Phase I area <br />i <br />will be stockpiled in the processing si e. Topsoil in Phase II <br />3', <br />and III area will be s ockpiled along he perimeter of the pit. <br />9 2. Excavation of the pit ru sand and gravel with front end <br />loader and backhae, which "11 1 d the material into trucks <br />~ to be transported to the pr ces ing site. <br />3. Crushing and Screening the p run aggregate to make <br />marketable aggregate for r d b se, asphalt cement and <br />f <br />concrete. <br />-- `~ Since the gravel pit is located djacent to the Colorado River, dewatering <br />A <br />-~~# will be re wired to mine the f 11 de th of t <br />q p gravel. Dewatering will be <br />• -~ ~• done in accordance with the r quirements of ou NPDES Permit. <br />= ~ Topsoil over the site vari s from approximately inches Lo 1-1/2 feet. The <br />-- -= topsoil cover is greater n Phase II area and the least in Phase III. Gravel <br />- -- depth varies from 12 to 8 feet, with the underlyi g material being Mancos <br />- _~ ~ Shale. <br />~" -'" Mining will start in he Fall of 1982. Total time req fired to completely <br />C° :•>: deplete these gravel deposits is expected to take 8 to 0 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.