Laserfiche WebLink
<br />STATE OFOOLO RADO eiC~AFOD t~~~iu G:~ III IIIIII IIIIIII III <br />999 <br />DEPARTMENT OFNATURAL RESOURCES <br />0. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Streel <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />September 1, 1982 <br />United Sand 6 Gravel Company <br />P. O. Box 476 <br />Grand Junction, Colorado 81502 <br />Re: Annual Fee/ ".DeBegve Pit", File No. 81-58 <br /> <br />SEP l : 19132 <br />MINED LANU REi.LFt~AAl'~ <br />Celo. Dept. of Natural ~lesoulEeS <br />Based upon our reco7-ds, the anniversary date of you<- mining operation pernit is <br />9/7/81 and annual fees for the year(s) 81-82 totalling <br />S 350.00 are due on that date, Fees are based upon a schedule of <br />$350.00 if the operation is an open mining operation of IO acres or more and <br />5275.00 for any other operation 10 acres or more. <br />• Also, to bring the Pi vision up to date as to the mining and reclamation on the <br />site, please submit a report and map (to a scale of not Zess than 100' to the <br />inch and not more than 660' to the inch), indicating the phases of the reclama- <br />tion plan which have been completed, correlated with the timetable. The report <br />and map shall contain the following information: <br />1) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3) The location and numbe_* of acres in the various stages of reclamation <br />(backfilled, graded, topsoil replaced, revegetated), <br />4) The species of vegetation planted, the locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil conditioners us.=d and location of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narrative on the suspected or determined <br />causes of such failu.ce, <br />7) estimates o.f the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date. <br />L ~1 <br />~ G3or ~, <br />\J <br />