Laserfiche WebLink
FILE M-78-210 ~~,r ~ ~ p• <br />MINE Giesert ~i L I; ~ ~`~ ~;-~ <br />DATE November 20, 1988 ,i~:;it;l;`F•,~~,~i:~ ~'• .. .. :~~. <br />116(1)(a) 2.41 Annual Reports <br />2.41 On the anniversary date of each permit year, the operator <br />shall submit a report and map (to a scale of not less than <br />100' to the inch and not more than 660' to the inch), <br />indicating the phases of the reclamation plan which have been <br />completed, correlated with the timetable. The report and <br />map shall contain the following: <br />1. Location and number of acres affected during that year. <br />8 Acres. Just took gravel down to water line. <br />2. Locations and number of acres reclaimed for that year. <br />4 acres were reseeded. <br />3. The location and number of acres in the various stages <br />of reclamation (backfilled, graded, topsoil replaced, <br />revegetated). <br />Sloped 300 yds. on north bank <br />4. The species of vegetation planted, the locations and <br />approximate dates of planting. <br />Buffalo grass, crescent wheat grass, oats, and various <br />other grasses. Set out spruce & pine trees in May, 1988 <br />S. The type and approximate quantity of fertilizers, <br />organic material or soil conditioners used and <br />location of use. <br />Nitrate and ohos <br />6. An appraisal of the success of reclamation efforts, and <br />in the event of failure of any efforts, a short narrative <br />on the suspected or determined cause of such failure. <br />First seeding in 1987 didn't take, got too dry. The <br />second seeding in 1988 received an 807 germination. <br />7. Estimates of the location and number of acres to be <br />affected in the coming year. <br />8 Acres will probably finish below water line, depending <br />how much eravel we will need. <br />8. The effective date of the information provided above <br />shall be no more than 45 days prior to the anniversary <br />date. <br />:fmar <br />~I <br /> <br />