Laserfiche WebLink
area shall be monitored. affected area are <br />monitored. <br />Rule 2.05.6(6)(c)(i)(D) <br />Monitoring of <br />established monuments <br />and structures shall be pAP, page 2.05-185. <br />performed at least No monitoring was 1'es, by No monitoring <br />quarterly, commencing accomplished exception <br />one month prior to the <br />initiation of mining <br />beneath any established <br />monument or structure. <br />rule 2.05.6(6)(c)(i)(E) PAP, pages 2.05-185 <br />and 2.05-186. Reports The report is due by March 1, <br />Results of the <br />at'e to be submitted 60 2005. The Division received a <br />monitoring program <br />days after the end of a <br />Yes telephone call that the report was <br />shall be submitted to the <br />Period. The format of in the mail (express) on March 1. <br />Division at least semi- <br />the report is at Exhibit It was received at the Division on <br />annually. <br />34 of the PAP. March 2. <br />The monitoring program shall be designed to extend for a time, beyond cessation of mining in <br />an area, consistent with the need for verification of the subsidence rediction. <br />Conducted sufficient <br />post-mining monitoring Rule 2.05.6(6(c)(i))(F) Yes PAP, page 2.05-185 <br />to verify subsidence <br />prediction <br />Accurately predicted Rule 2.05.6(6)(d)(i) Yes In compliance based on previous <br />subsidence. observations. <br />There was no imminent <br />or actual material <br />damage or diminution of 2.05.6(6)(d)(i) Yes In compliance based on <br />use of renewable observations below. <br />resource lands or <br />structures <br />