Laserfiche WebLink
III IIIIIIIIIIIII III <br />1 <br />December 11, 1998 <br />- ~CEIVED <br />~~~ 14 SJJO <br />;wraps g,Geobgy <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-BB-112, TR-010 <br />Weekly Pond Compliance.. Report <br />December 06 - December 12, 1998 <br />Dear Mr. Dillie: l~~`J <br />Attached is a sran¢nary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of December 06 <br />- December 12, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.024 ppm CN-wad and 0.782 <br />ppm CN-total. The collection pond averaged 0.013 ppm CN-wad and 0.014 <br />ppm CN-total. <br />S~/i/x1/Cerely, <br />I i/`'~ur~,Lr~vGL~t~~~ <br />Ron Z waft <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />