My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-18_REPORT - M1982155
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1982155
>
2006-12-18_REPORT - M1982155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:37:53 AM
Creation date
11/26/2007 11:31:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
Report
Doc Date
12/18/2006
Doc Name
Annual Fee/Report/Map
From
Schmidt Construction Company
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Pages <br />2006 Annual Report <br />Fountain Pit RE~E~~/ <br />ED <br />M-1982-155 DEC 182006 <br />Schmidt Construction Company Division of Reclamatio <br /> <br />Anniversary Date: December 31 n, <br />Mining and Safety <br />Overview of Permit Year: During the 2006 operating year [here was a good deal of activity at this site. The <br />mining expanded into previously unstripped land. It is expected that a little more land will be stripped during <br />the next year. <br />Annual Report Maps: The annual report map looks very similar to the 2005 map, but the mining boundaries <br />have shifted slightly. Also, some of the older categories of disturbance have been remapped using new aerial <br />photography. As a result the acreages in some of those area have changed. One significant addition to the map <br />is the inclusion of the water line corridor. This land is being xevegetated. <br />Affected Lands: The amount of affected land has increased in the last year. The main cause of this change is <br />the result of mapping from a new aerial photo of the site. The same processes of operating the pit axe being <br />used as have been used in the past. The plant was relocated to the southeastern corner of the pit, much closer to <br />the actual extraction. The amount of conveyor has been dramatically reduced. <br />Revegetation: The site is stable and is not subject to erosion. No additional xevegetation was done in the last <br />year. A great deal more backfilling is occurring in mined out areas. <br />Expected Activity (2007): Mining will primarily proceed southward and somewhat eastward undisturbed <br />land. The amount of land provided on the map (11.5 acres) for expansion in the next year is probably overly <br />generous, but that amount is possible if the market remains fairly strong. <br />Bonding: This operation is covered by a self bond. <br />Schmidt Construction Company 2006 Annual Report M-1982-155 Fountain Pit Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.