Laserfiche WebLink
Quality Control Air Testing (continued) <br />Page 2 of 2 <br />Project: American Soda Upper Plant, CLI Job No. 00183 <br />Dete of <br />Test Time of <br />Test Seam <br />No. Seam <br />Len th T <br />No. P <br />No. PB <br />No. A <br />C A <br />L V <br />B S <br />T Pass <br />/Fail Welding <br />Technician Welder No. Welder <br />Seed Welder <br />Tem Air <br />Tem . <br />3/3/00 5:20 26 18' X P DL 0007 10 f m 780 F 65 F <br /> 5:30 27 33' X P DL <br /> 3:45 28 36' X P DL <br /> 5:40 29 71' X P DL <br /> 4:00 30 56' X P DL <br /> 4:10 31 56' X P DL <br /> 4:15 32 43' X P DL <br />3/4/00 IO:OOa 33 22' X P DL 0007 <br /> 10:15a 34 39' X P VD 00015 <br /> 10:25a 35 19' X P DL 0007 <br /> 11:30a 36 71' X P DL <br /> 10:45a 37 85' X P DL 0007 <br /> 11:OOa 38 27' X P VD 00015 <br />3/4/00 11:45a 39 155' X P VD 00015 10 m 780 F 65 F <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />T=T-Weld P=Patch PB=Pipe Boot AC=Air Channel Test AL=Air Lance Test VB=Vaccum Box Test ST=Spark Test <br />COLORADO LINING INTERNATIONAL <br />CORPORATE OFFICE <br />1062 Singing Hills Road Parker, Colorado 80138 800 524 8672 JO3 841 2022 Fax 703 841 5780 www.coloradolining.com <br />