Laserfiche WebLink
SLOPE STABILITY <br /> <br />INTERIM INSPECTION REPORT <br />AREA Wadge highwall drainage fill DATE 11/21/91 <br />TIME 1 p.m. WEATHER Snowing 30° F <br />2. <br />3. <br />4. <br />5. <br />6 <br />7. <br />8 <br />9. <br />Debris, organic matter, coal, etc., present in fill None visible <br />General gradation and characteristics of material No apparent change from the <br />October 1, 1991 inspection. <br />Presence of water, surface and ground The ground was covered with one foot <br />of snow. No visible water movement or ponding. <br />Condition of underdrain (approx. current width, depth, and length), material <br />gradation and characteristic, compaction, presence, of water N/A <br />General material movement None visible <br />Proximity and treatment of seep points Nnt app],icahlP <br />Condition of sloppe fill surface (grading, cracks or sloughing, erosion, <br />revegetation) No visible change noted; snow covered. <br />Recommendation Continued observation when the fill is placed and the <br />West Wadge pit is graded and reclaimed. Differential settlement and <br />erosion should be monitored and repaired as necessary. <br />Accountability <br />I certify th ~Q~c <br />the bes~~Pp~RE~g' <br />..... <br />• .• <br />~~Or•~9J.G'E, <br />:~: / <br />. * ~dB~o, <br />ng observations and comments to be true and accurate to <br />DEC 0 6 lyyl <br />Date <br /> <br />