My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP06838
DRMS
>
Back File Migration
>
Report
>
REP06838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:12 PM
Creation date
11/26/2007 11:28:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
7/29/1999
Doc Name
PROFESSIONAL CERTIFICATION FOR THE COAL PROCESSING WASTE BANK AT THE DESERADO MINE PN C-018-81
From
BLUE MOUNTAIN ENERGY
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Three compaction tests were performed on sub-area 2/3/4 during March. All areas tested <br />exceeded the required Proctor level of 90%. <br />The topsoil and subsoil piles for sub-areas 1, 2-3, 4 and Sa have been seeded and are stable. <br />Vegetative growth appears adequate to control erosion on [he piles with [Ite exception of the very <br />tops of the Sa soil piles. These piles received additional material this pas[ summer during the <br />enlargement of the sediment ponds and the refuse pit combination. The areas that received the <br />new soil are essentially flat and were left rough to retain moisture. Tltey were seeded this winter <br />and harrowed during March to further stabilize the piles. <br />Quarterly monitoring of RP-4 refuse pond embankment has continued, and to date appears to be <br />stable. <br />To the best of my knowledge, based on my professional expertise, the permanent refuse structures <br />at tfte Deserado mine are being constructed in conformance with the prudent state-of--the-art <br />constnution practices as they relate to coal processing waste bank construction. Further, the <br />sVuc[ures are being constructed in compliance with the approved design, as specified within <br />Section IILB.3 of the approved permit documents and depicted on Maps 76, 77, 82 and 83 and <br />other permit documents or maps as amended from time to time. <br />1 certify, based on my field observations and those observations of my qualified designates and <br />professional investigations, as detailed above, that the permanent refuse disposal structures at <br />Blue Mountain Energy, Inc., Deserado Mine, located in Rio Blanco County, Colorado, are being <br />constructed in compli with the design approved as a portion of Pen»it No. C-018-81, issued <br />by [he Coloradow~~ E1~IL4 _ ~ erals and Geology. <br />Respectful) <br />~'l/ >.~ <br />William C. Lepr . AL~`- <br />Project Engineer <br />Colorado Registered P.E. No. 30263 <br />xc: Murari Shrestha <br />Jeff Dubbert <br />Scott Wansted[ <br />File <br />
The URL can be used to link to this page
Your browser does not support the video tag.