Laserfiche WebLink
<br /> <br />The September Morn Mine has been reclaimed. Umetco plans to revegetate [he site in <br />2002 due to recent draught conditions. The existing DMG bond should be sufficient to <br />revegetate the site. The Rim Rock #5 Mine has been reclaimed and the DMG is <br />processing [he release. <br />The DMG has released the Mexico Mine with the exception of a small area that is <br />infested with knapweed. The area was recently sprayed, and permit release is expected in <br />2002. <br />Umetco no longer controls the Rimrock Blues Mine. The associated DMG and WQCD <br />pemu[s were transferred to Grand Mesa Mining Company in 1995. <br />If you have any questions, or need more information, please call. <br />Sincerely, <br />(~ <br />Tony Bates, P.E. <br />Mines Reclamation Manager <br />ASB:ses <br />c: Loren Wickstrom, BI.M <br />W. Erickson, DMG <br />oi-na.ao~ <br />