Laserfiche WebLink
• ANNUAL REPORT • <br />INSTRUCTIONS r <br />Accordine [o C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-116(3)(x). on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances' [o affected land, <br />reclamation accomplished to date and durine the preceding year, new disturbances [hat are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during [he upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />IF your operation is subject to the provisions of Temporary Cessation as defined in [he Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(x): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented [o comply with reclamation- performance <br />standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.l~(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Wartanty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(x), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407, and Rules 1.15(l)(b), permits secured with a <br />Deed of Tntst or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the property subject to either of these instruments. The report shall also provide <br />~ -proof that there:are~no~past-due propert;. taxes.- - - - - ~- - - _ -_ -_ <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (l0%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c), all monitoring information <br />required as pan of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />