~, -
<br />~ { ANNUAL REPORT
<br />INSTRUCTIONS
<br />According to C.R.S. 34-3?-1 l6(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the permit each year.
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land,
<br />reclamation accomplished [o date and during the preceding year, ne~v disturbances that aze anticipated [o occur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (.4n adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report [he following information as required by 2 CCR 407-1, =107-4, and Rules
<br />1.13.7(1)(a):
<br />(I) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemented to comply with reclamation,
<br />performance standazds and Environmental Protection Plan requirements, if they aze pan of your
<br />approved application; and
<br />{iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Repoli, as applicable:
<br />{a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />regazding the sufficiency of the value of the Financial Warranty, :pe~ifically:
<br />(I) Per the requirements o£2 CCR 407-1, 407-4, and Rules 1.15(])(a), provide an updated
<br />statement re~azding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement,
<br />and the value of the property subject to either of these inswments.
<br />The report shall also provide proof that there aze no past-due properly taxes.
<br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstratins that the
<br />Le[[er of Credit does not exceed [en percent (10%) of the bank's capital surplus accounts.
<br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by' a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledsed fixtures
<br />and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c), a]] monitoring information
<br />required as pan of the approved permit application, to i.^.clude the Environmental Protection Plan.
<br />(Please note that if you are not a Designated ivtining Operation, you will no[ have an Environmental
<br />Protection Plan as part of your approved permit.)
<br />
|