Laserfiche WebLink
(3) Measure weekly for conductivity, PH, temperature, oil/grease, settleable solids, and flow for all <br />discharging water from ponds. Test for total suspended solids, total dissolved solids, and 'von once a <br />month for Outfall 007. <br />' (4) Measwe water conductivity, PH, temperature, oil/grease, settleable solids, total suspended solids, total <br />dissolved solids, and iron. Full suite laboratory analysis (February, May, August, and November on <br />quarterly schedule), if pond(s) are discharging for Outfalls 001 through 007. <br />(5) Measure water conductivity, PH, temperature, oiUgrease, and flow/depth. Have full suite laboratory <br />analysis (February, May, August, and November on quarterly schedule and May and November for <br />Semi-Annual schedule) for listed groundwater monitoring wells and surface monitoring stations in New <br />Horizon 1 Mine. <br />' (6) Measwe water depth for groundwater monitoring wells (GW's). <br /> <br /> <br /> <br /> <br /> <br />5 <br />