My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP06578
DRMS
>
Back File Migration
>
Report
>
REP06578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:02 PM
Creation date
11/26/2007 11:23:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977020
IBM Index Class Name
Report
Doc Date
3/18/1986
Doc Name
112 ANNUAL FEE LETTER
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ee <br />DC~d4~- 5~1~1D <br />loi1HD QIRAVEL.4~~o <br />P.O. BOX 103 DELTA, COLORADO 81416 <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Attn: David C. Shelton <br />Dear Mr. Shelton: <br />~ ~~Ei`~~:~~ <br />MAR 1 g X986 <br />March 17, 1986+~. ~ ;-f ~t,~l,_,~ RESD. <br />Re: Notice of Intent to Continue Mining <br />Delta Sand and Gravel Co. <br />Permit ~~ 77-20, Pit ~k 1 <br />From our Pit ~k 1 this year we have only mined approximately 30,000 <br />tons and at present are only planning on approximately 30,000 more <br />tons this spring due to the extremely poor economic conditions in <br />this area. <br />We continue to mine the operation in our Phase I operation by mining <br />sand and gravel to the final 8' + of the bottom of the pit to the <br />top of the mancos shale. We are mining from east to west and have <br />now mined to the bottom of the deposit for approximately 1/2 of our <br />Phase I stage. <br />Present plans for reclamation are to work on the slope areas on the <br />east and southeast sides as soon as we are approximately three- <br />fourths of the way through the excavation of the final 8' + in the <br />Phase I of our mining. We feel it is necessary to complete three- <br />fourths of the Phase I in order to maintain the good quality of our <br />discharge water in our dewatering operation. <br />No slope work shall be performed on the north slope. This is <br />necessitated by the fact that we have a dike of approximately <br />6' - 10' in height along this side to prevent the river from <br />flooding our pit in the event of high water which has been <br />experienced twice since this pit was opened due to the fact that <br />adjacent land owners will not do any work whatsoever to control <br />riverbank erosion or flooding from or on their properties. <br />~-~-~ <br />~~ l~ <br />.- <br />DELTA 874.9759 PAONIA 527.4174 RANGELY 675-2315 <br />
The URL can be used to link to this page
Your browser does not support the video tag.