My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP06552
DRMS
>
Back File Migration
>
Report
>
REP06552
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:01 PM
Creation date
11/26/2007 11:23:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/19/1994
Doc Name
ANNUAL REPORT MLR M-77-129 WHITEWATER PIT 500 MESA CNTY FED TAX 84-0536087
From
WHITEWATER BUILDING MATERIALS CORP
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee Name: ~eter Building Materials, Corp. . • <br />Permit No: M-77.129 <br />Operation Name: Whitewater 500 Pit <br />Anniversary Oate: 09 / 22 194 <br />The following information is in reference to Rule 1.15 of the <br />MLRB Rules and Regulations, revised 1994. <br />(1) Mining continued in Stage 1 and Stage D `on the areas pre- <br />viously stripped. In Stage 1 we Conti ed to removed minor <br />amounts of gravel from the floor of the mined area as we do <br />reclamation. Mining in Stage D continued on 1.97 ac. ± as <br />shown on Map #2 (blue). The Plant Site in Stages W, Z and 2 <br />is still in use (gray). In addition, 5.01 of the 17.94 acres <br />± was stripped in Stage 2 last year was partially mined <br />(blue). <br />(2) Most of the reclamation is complete in Stage 1 at this time. <br />We completed sloping on 2.48 ac. ± of the west side of the <br />mined area this year (yellow). The final grading was complet- <br />ed on 1.68 ac. ± in Stage Y as well (yellow). Overburden not <br />needed for reclamation in Stage 2 was placed in the southeast <br />corner of Stage 1 filling 12.00 ac. ± (tan) and creating <br />slopes into the bottom of the excavation area. We are still <br />dewatering Stage 1 until the last material is removed from the <br />bottom of the lake, to be completed this year. These area was <br />confined to the portion of Stage 1 that will be lake bottom <br />when reclamation is complete so no reclamation is required in <br />that area. <br />All the revegetation area in Stages X, Y and 1 are resoiled <br />ready for revegetation when the water returns to the lakes. <br />We should note here that this was a severe draught year in the <br />Grand Junction area so all vegetation has taken a beating <br />therefore no revegetation efforts were made or required this <br />year. Stages A and B are resoiled and we have a stockpile of <br />soil ready to be placed on Stage C when grading is complete. <br />We have 1,000 YD3 of topsoil stored in Stage 1 (green) and <br />6,000 YD3 in Stage 2 (green). <br />(3) We will continue to mine on the 17.94 acres ± (orange) <br />stripped last year. Mining will continue on the 1.97 acres ± <br />partially mined in Stage D (blue and may expand onto the 5.14 <br />ac. ± remaining in that stage (red brown). If additional <br />mining area is needed the areas disturbed in Stages 2. The <br />minor amount or rock left in stage 1 will also be removed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.