Laserfiche WebLink
<br /> Require- <br /> Require- ment <br />Requirement ment complied Comment <br /> citation with ? (yes <br /> / nol <br />X. Minimization <br />of <br />disturbance <br />to the CDMG The disturbance to the hydrologic balance within and adjacent to <br />hydrologic <br />regulation <br />es the permit azea caused by mining and reclamation at Chimney <br />balance <br />4.05.1(1) y Rock was [he minimum that can be expected from a surface pi[ <br />within and operation. <br />adjacent to <br />the permit <br />area <br />Y. Prevention of <br />Mining and reclamation a[ Chimney Rock Mine so far has <br />material caused only minor impacts to the hydrologic balance outside the <br />damage to the CDMG permit azea. The probable hydrologic consequences (PHC) <br />hydrologic regulation yes section of the petmit application projects future impacts to be <br />balance 4.05.1(1) minor, but the PHC may need updating as explained in the <br />outside the attached letter. <br />ermit azea <br />Z. Agreement CDMG <br />of observed regulation <br />hydrologic 2.05.6(2) <br />impacts with <br />" and Although, observed impacts are consistent with those projected in <br />probable requireme the PHC, the PHC may need updating as explained in the attached <br />hydrologic nt to keep yes letter. <br />consequences informatio <br />" (PHC) n current, <br />projected in CDMG <br />mining regulation <br />ermit 2.03.3(1) <br />AA. Adequacy <br />of ground CDMG Monitoring was suspended for 1998 and 1999, and will resume <br />water regulation yes in 2000, two years before an anticipated request for Phase ID <br />monitoring 4.05.13(1) release. <br />ro ram <br />BB.Adequacy of CDMG Monitoring was suspended for 1998 and 1999, and will resume <br />surface water regulation yes in 2000, two years before an anticipated request for Phase III <br />monitoring 4.05.13(2) release. <br />ro ram <br />Page 4 <br />