Introduction <br />According to Stipulation No. 29, Permit No. C-81-038, the operator submits the following Annual Mine <br />• Inflow Report for the period of July 1,1999 through June 30, 2000. <br />Mining Locations and Projections <br />Mining operations at Bowie No. 1 Mine have temporarily ceased due to market conditions and coal quality <br />issues. It is unclear at this time where mining operations would resume in the event that this coal reserve <br />becomes economically viable. <br />Mine Inflow <br />The underground Mine Inflow Study at the Bowie No. 1 Mine was not conducted during 2002, as the mine <br />was inactive and inaccessible. <br />No water was discharged from the mine to the surface during the 2000-2001 reporting period. The <br />operator has no plans to discharge water from within the mine to the surface during the 2002-2003 <br />reporting period. No water has been dischazged from the mine to date. <br />Water Importation and Balance <br />There was no production of coal from the Bowie No. 1 Mine from July 1, 2001 through June 30, 2002. <br />Production estimates for the following twelve month period remain at zero. Historically, mine water <br />importation is estimated from recorded flows and related tonnages at the mine from September,1985 <br />through April 1986. With no coal production to base water usage upon, the operator submits only water <br />used for dust suppression at the Unit Train Loadout, which shipped approximately 5 million tons of coal <br />from the Bowie No. 2 Mine. The bath house has not been used since March of 1999. <br />. These water quantities aze listed as: <br />Acre Feet <br />Dust Suppression on Bowie No. I Roadway' ............................................0.00 <br />Bathhouse Consumption2 ............................................................ 0.00 <br />Evaporative Loss from Ponds ........................................................ 4.60 <br />Silo Usaee' ....................................................................... 8.06 <br />Total water usage 12.66 <br />Hydrologic Impacts <br />There was virtually no water inflow into the mine. Therefore, the hydrologic impact caused by the mining <br />operation is either non-existent or not measurable. <br />Conclusions <br />No mine discharge and minimal importation of water is anticipated during the 2002-2003 reporting period. <br />Therefore, the quality and quantity of surface water adjacent to the mine will not be affected. The operator <br />will continue to submit the Annual Subsidence and Hydrology Report which will summazize all subsidence <br />and hydrology data. <br />'No or minimal consumption <br />ZBathouse no longer in use. <br />-•' 'Calculated from meter readings at the Unit Train Loadout water meter. <br />-1- <br />