Laserfiche WebLink
III Illlllllllllllll <br />999 <br />~Fc=iv~~ <br />JAN p 2 1998 <br />Jivi^cn o. aancr..ia u Gr,21a~y <br />December 31, 1997 <br />Mr. Jim Dillie Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />weekly Pond Compliance Report <br />December 28- DD111//eAA~~cember 31, 1997 <br />Dear Mr. Di11ie: l//.A 1~ <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of December <br />28- December 31, 1997 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.012 ppm CN-wad and 0.022 <br />ppm CN-total. The collection pond averaged 0.024 ppm CN-wad and 0.030 <br />ppm CN-total. <br />Sincerely, <br />J tlio F. M id <br />cc: Bill Lyle <br />Dan Robertson <br />