Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 2 Inspection - 2nd Quarter 2004 <br />On June 22, 2004, I performed the required quarterly visual inspection of the Cameo <br />Refuse Disposal Area No. 2 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The entire pile was dry including the terraces. No <br />seepage was noted around the pile. The upper diversion ditch was inspected with no <br />problems noted. The pile has been covered with the required 24 inches of non-toxic <br />material. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 2 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />Recommended maintenance: None <br />flysao® <br />•©ap0 4ig~s0+ <br />~ ,,,..,.,, lf, s <br />io~O~s,S = Sj~J9~„Qs~ <br />,tames ~a~over is ~s <br />~,. <br />"~,,.,~ ,, ~,~ <br />P.E. No.'13Q,,.....•N~~~e <br />• ~NAI ;r <br />Date <br />