Laserfiche WebLink
to replace them. The April 1996 samples are included in the <br />revised 1995 Hydrology Report in place of the December 1995 <br />data. <br />6. Manganese is not a parameter that Eastside Coal is required to <br />sample for. <br />7. The seep is only required to be monitored monthly for field <br />parameters as stated in Eastside Coal's Permit. <br />Sincerely, <br />~~~iy""""~l, !~ <br />Stephen S/@~~. <br />General Manager <br />Eastside Coal Company, Inc. <br />Enc <br />