Laserfiche WebLink
a' <br />These new wells are SF-I and SF-2. Both of these new wells are very low yielding and 1o date we <br />have had insufficient water to collect a sample. Six new wells were completed in the backfill during <br />January. The new wells are BF-3, BF-4, BF-5, BF-b, BF-7 and BF-8. All have been sampled except for <br />8F-8 that is dry. Two new wells were completed in the pre-Cambrian and their designation is PC-1 <br />and PC-2. Both have been sampled. <br />Water was pumped from the seep collection trench io the infiltration trench all during the month of <br />January. A peristaltic pump was installed in the small rivulet that remained in the seep area and this <br />water is currently being returned to the french drain collection sump and then 1o the infiltration <br />trench. <br />A formal public hearing was held before the MLRB in Colorado Springs on January 26, 1999. The <br />Division recommended that a NOV not be issued to BMRI. The Board concurred. BMRI will move <br />forward with the Response Plan. <br />Sir)_cerely, <br />,' <br />Ron Zumwalt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />