Laserfiche WebLink
Proposed 1991 Monitoring <br />.~ ~~:~~~ <br />With the reclamation phase of the mine now in progress, surface water monitoring oC water quality and <br />quantity will continue on a quarterly frequency with the same parameters. AIP stations currently being <br />monitored will be continued through September 1991, when the reclamation activities are projected to be <br />complete. At that time, no further sampling will be conducted. NPDES sampling and monitoring will be <br />wntinued as required by [hat permit. <br />