Laserfiche WebLink
Annual report -Additional comments <br />Acme Brick -Denver <br />Dawson Mine <br />Mining for the 2003 year was limited to same sma112 acre area that was <br />mined in 2002. Topsoil was spread over mined area and will be seeded this <br />spring. Also the l 8 acre area that has been mined in the past is being graded <br />at this time and will be seeded this spring also. <br />Mining for the year 2004 will be concentrated on the SW end of the recently <br />amended 7.35 acres. <br />Weed control will take place on areas of permit that are needed. <br />Thank You, <br />Charles Platt <br />