Laserfiche WebLink
<br />r <br />~..~. <br />f4arch 22, 1983 <br />Galen L. & Thelma <br />31695 Road AA <br />Shyder, Colorado <br />. r!- <br />STATE OFCOLO RADO RiCHARDD LAMM Ga~'e ~~ar <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe. Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />J. Headley <br />A0750 <br />Director ~ <br />2 <br />~~~~ .O~ <br />~~/~ ~HHSosS <br />,~~ !'6~~~0~~~ <br />APR 1 1 1983 <br />Re: File 80-135; fiEADLEY FARf1S <br />MINED LAND RECLAMATfON <br />Colo. Dept. of Natural Resmar.- <br />Based upon our records, the anniversary date of your mining operation permit is <br />October and annual fees for the year(s) 1981, 1987_ totalling <br />S are due on that date. Fees are based upon a schedule of <br />5350.00 if the operation is an open mining operation of 10 acres or more and <br />5275.00 for any other operation 10 acres or more. <br />Also, to bring the Division up to date as to the mining and reclamation on the <br />site, please submit a report and map (to a scale of not less than 100' to the <br />inch and not more than 660' to the inch), indicating the phases of the reclama- <br />tion plan which have been completed, correlated with the timetable. The report <br />and map shall contain the following information: <br />I) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3) The location and number of acres in the various stages of reclamation <br />(backfilled, graded, topsoil replaced, revegetated), <br />4) The species of vegetation planted, the locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used and location of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narrative on the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided aDOVe shall be no more <br />than 45 days prior to the anniversary date. <br />