Laserfiche WebLink
<br />~ Nonitoring Stations and Frequency <br />a (A) Continuous Record of Flow <br />HPDF.S discharge point 001 (SW-NS) <br />(e) Monthly ~ ' <br />A-J <br />Surface water flow, pH, electro-conductivity, and temperature for <br />monitoring sites on Tuttle Draw, SW-N1 and SN-N? and on tributary sites <br />SW-N6 and SW-H5. <br />Pit hlghwall seep flow (visual estimation) <br />Ground water levels in all monitoring wells. <br />(C) Quarterly (Nay, July, October and Januazy) <br />Pit highwaIl seep water quality. <br />(D) Biannual (May end October) ~ . <br />Surface water quality analyses for parameters listed on preceding page. <br />The following stations should be monitored: SW-N1, SW-N1, SN-N6 end <br />SW-N5. <br />• Ground water quality analyses for parameters listed on preceding page. <br />The following yells should be aampled+ GW-NJ, CW-N4, GW-N9, GW-N10, <br />end pit highwall seep. <br />Reporting of Nonitoring Data <br />NPDES reports and all ground end surface water date reports are to be submitted <br />quarterly to the Division. The quarterly reports should include only data <br />collected during that quarter. The reports should be submitted within one <br />month of the receipt of results. <br />r <br />~. <br />H-4 <br /> <br />,..-.. . <br />