Laserfiche WebLink
OLD G7ASTE DISPOSAL PILF. <br />P10NTH LOADS X 14.8 YD3 LOADS - YD3 TOTAL YD3 <br />March 1482 100 1 ,480 1 ,480 <br />A ri1 1982 50 740 2,220 <br />Ptay 1982 40 592 2 ,812 <br />June 1982 60 888 3,700 <br />July 1982 61 902.8 4,602.8 <br />Aug. 1982 103 1,524.4 6,127.2* <br />Sept. 1982 42 621.6 6,748.8 <br />Oct. 1982 21 310.8 7,059.6 <br />Nov. 1982 0 0 7,059.6 <br />Dec. 1982 143 2,116.4 9,176.0 <br />Jan. 1983 288 4 ,262 .4 13 ,438 .4 <br /> <br />Feb. 1983 TEN <br />73 1 ,080 .4 <br />14 ,518.8 <br />March 1983 63 932.4 15,451.2 <br />April 1983 199 2,945.2 18,396.4 <br />M <br />May 1983 OTLFIED T AT P R <br />348 OACHIN C <br />5,150.4 YD. <br />23,546.8 <br />June 1983 200 2 ,960 26 ,506 .8 <br />Jul 1983 235 3 ,478 29 ,984 .8 <br />Aug. 1983 55 814 30,798.8 <br />Sept. 1983 --- R E C L A I M E D-- - <br />Oct. 1983 <br />Nov. 1983 <br />Dec. 1983 <br />** - 2 ,592 <br />TOTAL 1986 28,206.8 <br />TOTAL 04/87 28,206.8 <br />TOTAL 06/01/87 ***2,682.7 25,524.1 <br />*SURVEYED 09/01/82 APPROXIMATELY 4200 YD3 <br />**Note: 'This is [he amount of gob hauled from Che 01d Waste Disposal <br />Area to the Western Slope Carbon wash plan[ in 1986. <br />***Tons hauled to new waste disposal area. <br />