Laserfiche WebLink
<br />Annual Report <br />Del Camino <br />Permit # M-82-015 <br />November 20, 2000 <br />No additional mining or reclamation occurred during the 1999 mining season. The final <br />expected high water line is shown on the attached map of the area. Currently sloping has <br />been completed on all three lakes. Topsoil placement and seeding has been completed on <br />lakes #1 and #2. <br />No new disturbances aze planned during the upcoming year with the exception of <br />removing stock piles, as the mazket dictates. <br />