My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05760
DRMS
>
Back File Migration
>
Report
>
REP05760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:31 PM
Creation date
11/26/2007 11:09:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
6/11/1998
Doc Name
2ND HALF 1997 SUBSIDENCE REPORT
From
TWENTYMILE COAL CO
To
DMG
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOND HALF 1997 SUBSIDENCE SURVEY REPORT <br />I. Survey Data <br />During the second half of 1997, subsidence survey data was collected periodically from <br />established monuments on the Hayden -Gore Pass Power Line, and the Wolcott Tap - <br />Wolcott Power Line in those areas underlain by gate roads or panel centers during periods <br />of active longwall mining. <br />Prisms were set on legs of the metal structures of the Hayden-Gore Pass power poles at <br />S1, S2A, S2B, S2C, S2D, S3A, S3B, S3C, S3D and S4 and an initial survey performed on <br />August 8, 1997. Daily surveys were conducted from August 9, 1997 through October 10, <br />1997. Weekly surveys were conducted from October 17, 1997 through the end of <br />December, 1997. Table 1 provides a summary of the survey data collected for the first <br />half of 1997. <br />The Wolcott Tap -Wolcott survey data for the second half of 1997 are summarized in <br />Table 2. Prisms were set on power poles at W4, W6, W6A, W8, W8A and W10 and <br />initially surveyed on August 8, 1997. Daily surveys were conducted from August 9, 1997 <br />through October 10, 1997. Weekly surveys were conducted from October 17,1997 <br />through the end of December, 1997. <br />Foidel Creek was surveyed, see figure 1, after the 8 Right Longwall Panel subsidence and <br />the profile provided in the First Half 1997 Subsidence Report. Foidel Creek will be <br />surveyed again in the Spring of 1998 to develop a profile of the creek showing the <br />subsidence effects due to the mining of the 7 Right Longwall Panel. This profile will be <br />included in the First Half 1998 Subsidence Report. <br />II. Structures <br />Structures affected during the second half 1997 reporting period include the Union Pacific <br />Railroad track, the Hayden -Gore Pass power line, the Wolcott Tap -Wolcott power line, <br />and the Western Area Power Administration power line, and Foidel Creek. <br />The Union Pacific (UP) Railroad track visual inspections were conducted by UP <br />maintenance personnel from July 30, 1997 through September 10, 1997 for the second <br />half of 1997. The maintenance work performed during the period of subsidence included <br />placement of additional ballast on an as needed basis, and releveling the track with a <br />production tamper. All of the maintenance work was performed by UP personnel. <br />The Hayden -Gore Pass line, Wolcott Tap -Wolcott line, and Western Area Power <br />Administration line daily visual inspections were conducted concurrent with the survey of <br />the power poles from August 8, 1997 through October 10, 1997. Limited damage <br />occurred to the Hayden -Gore Pass structure, however, utility representatives inspected <br />
The URL can be used to link to this page
Your browser does not support the video tag.