East Portal <br />The coal loadout and substation constructed in 1994 were sold, disassembled and shipped from [he <br />property. The loadout [racks were removed and salvaged. The area was graded and drainage ditches to <br />pond 7 reestablished. <br />Other <br />Weed Control included limited hand spraying to control Canadian Thistle. <br />The Trinidad Railroad mainline was salvaged, starting from mile post 2 east of Trinidad Lake to the end of <br />the line (mile post 30 at the West Portal). All rail, ties and ancillary materials were removed. The mainline <br />right-of--way was excluded from the New Elk permit area and as such the removal was not part of any mined <br />land reclamation process. <br />Please call me if you have any questions or require additional information <br />Srely <br />Ronald G. Thompson <br />Enclosures <br />