Laserfiche WebLink
• APPROVED HYDROLOGICAL MONITORING PROGRAM <br />Table 2.04.7-1 summarizes various current approved monitoring sites. They are shown on Map <br />2.04.7-1-F. For New Horizon 2 Mine, the sites are based upon recommendations made by <br />Greystone Consultants and subsequent revisions requested by WFC.The monitoring plan revised <br />as per TR38 will be adequate for the Garvey and Burbridge leases included in the permit boundary <br />and other mining areas to the west-northwest that WFC intends to include within the permit <br />boundary in the near future. TR-47 resumes the monitoring of wells GW-N16, GW-N17 and GW- <br />N18. <br />Map 2.04.7-1-F shows the locations of surface stations and wells for the New Horizon Mine 2 <br />monitoring program. Modificationstotheexistingmonitoringlocationsforsurfaceandgroundwater <br />are discussed below. All data will be reported in the annual hydrology report. <br />• <br />• (Revised 1 S Aug 2003) 2.04.7-38 <br />