Laserfiche WebLink
__.. o. _..,.~ <br />TRI COUNTY GRAVEL OCT 1 O ZUO6 <br />PERMIT # M 1977-205 <br />PHASE 1 REVISION Division of Reclamation, <br />Mining and Safety <br />PHASE 1-All of phase 1 has been disturbed with approximately 1/8 of new gravel washed in <br />left. All banks have been sloped. Crusher site between phase 1 and 2 has had top soil removed <br />and stock piled for future use. Approximately 15 to 20,000 yards of top soil for reclamation and <br />sales stored. Opened phase 2 and started stockpiling material at crusher site located in south <br />parcel where crusher plant has always been located. Stock piled top soil removed from phase 2. <br />