Laserfiche WebLink
N ~ III IIIIIIIIIIIIIIII <br />~ s+~ <br />EXHIBIT D--RECLAMATION PLAN <br />D.1 General <br />At the conclusion of mining, all ventilation and production shafts will be back- <br />filled, all structures removed, the waste dump recontoured and available topsoil <br />spread over it to support vegetation. The direct costs are estimated to be <br />$20,631 and the work is anticipated to take approxim?tely one month. See Fig- <br />ure D-1 and Tables D-1 & D-2 for details of how the work would proceed. <br />D.2 Reclamation of the Van 4 Shaft and Ventilation Raises. <br />After removal of surface structures, the shafts will be balled with mine <br />rock to within eight feet of surface. If low~rade piles exist on surface at the time <br />of closing, this material will be used first to backfill the holes. Each hole will then <br />receive a 5 foot minimum concrete plug, and then covered with at least one foot <br />of topsoil. The area surrounding the hole will then be scarified and reseeded as <br />out lined below. <br />• D.3 Removal of Structures. <br />All surface structures including buildings, headframe, hoist, transformers, <br />fences, company-0wned power lines, fans and operation-related debris will be <br />removed and sold for salvage, buried as allowed by law, or disposed of in a li- <br />censed landfill. It is anticipated that no sign of the Van 4 operations be left on <br />surface other than a small surface expression of the waste dump. <br />D.4 Recontouring of Waste Dump <br />The waste dump will be recountoured to blend with the surrounding to- <br />pography with the out slopes reduces to a slope of 3:1 or less. While it is not <br />anticipated, any increase in the footprint of the dump due to slope reduction will <br />be after any and all topsoil is pulled back from the edge for use as additional <br />plant support medium. The crest of the dump will be fitted with a berm of at least <br />one foot in height to prevent erosion of the slopes and water bars will be in- <br />stalled at regular intervals on the surface of the dump to retain moisture, trap <br />sediments and control runoff. In addition to the above, a small ditch and berm <br />will be constructed around the down gradient side of the dump to insure that no <br />material leaves the site. The dump will then be covered with topsoil as available <br />and reseeded as outlined <br />below. <br /> <br />