Laserfiche WebLink
a <br />i <br />RECEIVED <br />JAN 2 5 1999 <br />~ ~ a+nfinerals 8 Geology <br />January 21, 1999 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc.. <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />January 17,//1999 - January 23, <br />Dear Mr. Dillie: ~~ <br />iii iiiiuiiiiiii iii <br />- San Luis Project <br />1999 <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of January 17, <br />1999 - January 23, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.105 <br />ppm CN-total. The collection pond averaged <0.010 ppm CN-wad and <0.010 <br />ppm CN-total. <br />Sincerely, <br />Ron m~walt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />