My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05219
DRMS
>
Back File Migration
>
Report
>
REP05219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:12 PM
Creation date
11/26/2007 11:00:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981235
IBM Index Class Name
Report
Doc Date
4/16/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII r ~~,~'~Y~85 <br /> RECEIVE D <br /> Notice of Intent to Continue Mining Operations <br /> 112c Construction Materials Annual Report <br /> APR 16 1998 <br />Permittee Name: Webster Sand & Gravel <br />Permit No. M-81-235 <br /> * DivisionotMineralsBGeoiogr <br />Operat ion Name: West Tennessee <br />Anniversary Date: April 22, 1998 <br />Total: 50.00 (Due on your Anniversary Date) <br />5 <br />$ <br /> <br />1. ~ <br />l <br />a. Permitted acreage: 1 Y ~ b. County where mine is ~ d <br />located: wll~ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br /> Does this mine operate MORE or LESS than 180 days per year? MORE I~S <br />3. Does this mine have a phased reclamation plan? YES <br />4. Total acres affected during the report year:* ~~ <br />5. Total acres reclaimed for the report year:* -~ <br />~, _ <br />6. Total number of acres in topsoil replacement stage: <br /> a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br /> a. List species seeded & seeding rate for report year on bac k <br />8. For non-phased operations provide dates extraction ceased: <br /> a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic mat erial or soil <br /> conditioners used for the report year:` <br />10. acres to be af <br />f <br />t ed in the ne <br />xt <br />r <br />e <br />port year: <br />Estimated rota l <br />ec ' <br /> 0Q <br />n <br />.n <br />/J1 <br />/~ <br />` <br />~ <br />~ <br />~ <br />11. CpMMENTS: ,~ i~7~Ai/'"'^'r~01 A~1(!/ n.lif ~ % % / ~ <br /> <br />shox~the 1 c of the acreage for ire 9 - 6 on your map**. ndicate <br />the p ases of the reclamation which have been complete correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature <br />Please type or print <br />Contact Name: <br />Company: <br />Address: <br />Federal Tax ID NO. <br />Date <br />contact name, mailing address <br />i ~ / ~.('7 <br />and phone /number b~e/l ow: ~/~ <br />Phone : ~ / / ) u SS ~'~7°~->~ <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.