Laserfiche WebLink
• <br />• <br />~- <br />n <br />LJ <br />STaTE OFCOLOAaDO oi_.n^DD ~>~^! ~_.. X11 ^1~~1~~1~~~~~ ^1~ <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />D Monte Pascoe. EzecuGve Director <br />NIINED LAND RECLAMATION <br />a23 Centennial Building. 1373 Sherman Street <br />Denver. Colorado 80203 Tel. (303) 866-3567 <br />October 9, 2982 <br />Butala Construction Company <br />P.O. Box 907 <br />Salida, Colorado 81201 <br />Re: Our File No. 77-170 <br />Dear Sir: <br />David C. Shelton <br />Director <br /> <br />b <br />OCT 11982 c <br />MINED LAND RECLAMATION <br />Colo. Dept. of Natural Resources <br />Based upon our records, the anniversary date of your mining operation permit is <br />October 1 and annual fees for the year(s) 1981-1982 totalling <br />5 350.00 are due on that date. Fees are based upon a schedule of <br />5350,00 if the operation is an ope(t mining operation of 10 acres or more and <br />5275,00 for any other operation 10 acres or more. <br />• AZso, to bring the Division up to date as to the mining and reclamation on the <br />site, please submit a report and map (to a scale of not Less than L00' to the <br />inch and not more than 660' to the inch), indicating the phases of the reclama- <br />tion plan which have been completed, correlated with the timeta~Ie. The report <br />and map shall contain the following information: <br />I) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3) The location and number of acres in the various stages of reclamation <br />(backfilled, graded, topsoil replaced, reveeetatedl, <br />4) The species of vegetation planted, the locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used and Location of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narratio•e on the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date. <br />• <br />