My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05184
DRMS
>
Back File Migration
>
Report
>
REP05184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:10 PM
Creation date
11/26/2007 11:00:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
8/4/1999
Doc Name
PROFESSIONAL CERTIFICATION FOR THE COAL PROCESSING WASTE BANK AT THE DESERADO MINE PN C-018-81
From
BLUE MOUNTAIN ENERGY INC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- -- <br />Three compaction tests were performed on sub-area 2/3/4 during April. All areas tested exceeded <br />the required Proctor level of 90%. <br />Ttte topsoil and subsoil piles for sub-areas I, 2-3, 4 and Sa have been seeded and are stable. <br />Vegetative growth appears adequate to control erosion on the piles. <br />Quarterly monitoring of RP-4 refuse pond embankment has continued, and to date appears to be <br />stable. <br />To the best of my knowledge, based on my professional expertise, the permanent refuse structures <br />at the Deserado mine are being constructed in conformance with the prudent state-of--the-art <br />construction practices as they relate to coal processing waste bank construction. Further, the <br />structures are being constructed in compliance with the approved design, as specified within <br />Section III.B.3 of the approved permit documents and depicted on Maps 76, 77, 82 and 83 and <br />other permit documents or maps as amended from time to time. <br />I certify, based on my field observations and those observations of my qualified designates and <br />professional investigations, as detailed above, [hat the permanent refuse disposal structures at <br />Blue Mountain Energy, Inc., Deserado Mine, located in Rio Blanco Cowtty, Colorado, are being <br />constructed in compliance with the design approved as a portion of Permit No. C-O18-81, issued <br />by the Colorado Division of Minerals and Geology. <br />xc: Jeff Dubbert <br />Scott Wans[edt <br />File <br />
The URL can be used to link to this page
Your browser does not support the video tag.