My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05142
DRMS
>
Back File Migration
>
Report
>
REP05142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:09 PM
Creation date
11/26/2007 10:59:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980037HR
IBM Index Class Name
Report
Doc Date
10/1/1991
Doc Name
Annual Report 1991
From
T M Russell & R C Barger
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • - Y • 999 <br />n. .r• <br />Notice of Intent to Continue Mining OpetFai~~~~'~ <br />112 Annual Report <br />Permittee Name: T. M. Russel l & R. C. Barqer ~ OCT 0 1 ~gg~ <br />Permit No: M-80-037HR Mined Land <br />Operation Name: Ingleside Quarry* Reclamation Divisian <br />Anniversary Date: 10/01/91 <br />Total: $430.00 (Due on your Anniversary Date) <br />1. Has your mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does your mine operate MORE or LESS than 180 days per year? MORE LESS <br />2. Totai acres affected during the report year:* ~_ <br />3: Total acres reclaimed for the report year:* ~ ~~_ <br />4. Total acres in various stages of reclamation:* <br />a. Backfilled: - d. Topsoil replaced: <br />b. Graded: _ Average topsoil thickness <br />c. Seeded: - replaced: <br />List species seeded & seeding <br />rate for report year on back <br />5. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />6. Estimated total acres to be affected in the next report year:* f~ <br />7. COMMENTS: N^ 6~e„~,~ ;~«~ may'(' ~ePer~ <br />* Please show the location of the acreage for items 2 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated <br />with your timetable. <br />NOrE: If there have not been any changes since the last annual report and <br />you previously submitted a map which correctly depicts the current acreage in <br />items 2 through 6, then a new map is unnecessary. However, you must state this <br />fact above. <br />Signature: ~~/~ Date: ~~lD ~/~~ <br />Please type or print current contact name, address, and phone number below: <br />Contact Name: ~. N, l~ u. Ss o t a Phprie: (3d'U) a~) - 3 5 30 <br />Company ~n~, l_T s. J ~ /`~vu •.-~.~ // <br />ine~a. Address: x I~(R~ 3_~. VAS, ~X~ <br />Matt P'ga$dx f„« OJi-r ,~ Co_ `IiD536 ~,~1 <br />Federal Tax ID No. or Social Security No.: .5a 5 - ~ I - 9~3 ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.