Laserfiche WebLink
Bowie Resources Limited Ground Water <br />Bowie No. 1 Mine <br />2004 Mnual Hydrology Repoli SM11 <br />• Monitoring Well SM-11 <br />Depth - 46.5' <br />Elevation • 7242.65 <br />IniBated 8/8(1986 8/8/1986 <br />Activated <br />Date 12/21/2004 6/29/2004 <br />Summary Information <br />Baseline Operation <br />I INITC Min Ova MaY Min Avn MaY <br />Static Water Level Feet 30.4 36.2 87.8 36.49 37.1 <br />Water Elevation Feet 7154.9 7206.4 7212.3 7206.16 7205.55 <br />Temperature Celsius 5 10.6 20.0 10.4 11.3 <br />Conductivity umhoslan 1400 1907 2610 2400 2400 <br />pH su 5.8 7.6 8.5 ~ 7.8 7.7 <br />Field Comments <br />Shalbw monitoring walls SM-1 through SM-11 were constructed in 1965 in order to gather additional in/ormafion <br />on alluvial/colluvial deposits within the permit boundary. They are depicted on Map 41. <br />I <br />Baseline Information Collection initiated on 8/8/86 antl not yet wnsidered complete. <br />Point SM71 has not been influenced by mining. FigUrB NO. 3~ <br />The area of concern for montoring point SM11 has not been affected by the mining opereiron. Therefore, all recorded <br />monitoring events are considered Baseline. <br />