Laserfiche WebLink
L _~ <br />Bowie Resources Limited <br />Bowie No. 1 Mine <br />2004 Mnual Hydrology Report <br />602 <br />Borehole 2 <br />Depth - 36.5' <br />Elevation - 7440' <br />Initiated 9/1/81 9/1/81 <br />Activated 9/1/81 9/1/81 <br />Date 12121104 6130104 <br />Summary Information <br />~~ <br />• <br /> Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Static Water Level Feet 10.50 31.57 37.50 34.67 34.62 <br />Water Elevation Feet 7402.5 7408.4 7429.5 7405.33 7405.38 <br />Temperature Celsius <br />Conductivity umhos/an <br />pH su <br />Reid Comments DrY <br /> UNITS <br />Bicarbonate mg1L <br />Carbonate mglL <br />Chbdde mgll <br />Conductivity umhos/an <br />Hardness mglL <br />pH su <br />ResidueFilterable-TDS mg/L <br />ResidueNOnFitterable-TS mglL <br />SAR <br />Sulfate mglL <br />Calcium (Dissolved) m <br />Ma nesium (Dissolved) mglL <br />Sodium Dissolved) mg/L <br />Potassium mgll <br />TDS Ra0o grav./wlc.) <br />The area of concern for monitodng point B02 was aHeded by the mining operation before Hs establishment Therefore, <br />all recorded monitodng events are considered Operational. <br />BorehWes B-1 and B-2 are boated at the East Mine ran level. <br />There is no baseline cellection possible for points initiated after the influence of mining. <br />Ground Water <br />Figure No. 2 <br />