My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04914
DRMS
>
Back File Migration
>
Report
>
REP04914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:00 PM
Creation date
11/26/2007 10:56:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
1/1/1989
Doc Name
QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT NEW WEST RIDGE PILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. <br />~~~ ~I~~I~~i~~~~~ ~II <br />COLORADO WESl?fORELAND INC. <br />ORCHARD VALLEY NINE <br />QUARTERLY WASTF. DISPOSAL AREA Il;SPECTION REPORT <br />NF.W WEST RIDGE PILE <br />i ITEM YF.S NO COMMENTS <br />I 1. Quantity of waste material added to <br />waste disposal area this quarter. There has been no gob hauled to <br />~ pit this last quarter because <br /> mining conditions have im- <br />I (See attached calculations.) proved. There is no material <br />i being hauled to the wash plan[ <br /> or the gob pit. <br />I 2. Waste material deposited and compacted <br />I in 24" lifts? X <br />~ 3. Drainage alterations constructed? X <br />i Average south side height is 52 <br />4. Present height of waste material. f[. <br />i Have started on the 2nd bench <br />I level of pile b construction of <br />' S. New bench constructed? X drainage ditch is underway. <br /> Cross sections of berm have <br /> been surveyed in and the pile <br /> was constructed at 1:1 -I /2 <br /> slope instead of 1:2. Present- <br />6. Refuse material outslope placed at ly working on options for <br />1V:2H? X rectifying problem. <br /> No soil cover has been placed <br /> as yet in the drainage ditch of <br />7. To of completed fill at 5%? X the second level. <br /> No erosion. Rock has been <br />' 8. Bench drainage adequate? ~ X cleared from drainage ditch. <br />9. Areas covered with 4 non-toxic non- 9" topsoil. <br />combustible material? X 3'3" subsoil. <br />10. Berms constructed on outslo es? X <br />11. Evidence of structural defects? X <br /> Subsoil b topsoil being removed <br />12. Topsoil adequately salvaged b stored? from storage areas. <br /> No material added to pi[ this <br />13. Trash being removed? X auarCer. <br /> No material added to pit this <br />14. Additional comments? X auarCer. <br />Inspector: /~ f/r /{~! ~~p ~ Date of Inspection: 11/88 <br />Z ohn H. Pienke, III <br />[ hereby certify that the construction of the waste disposal area was done under my direct <br />supervision and is constructed as per the current Colorado Mined Land Reclamation Permit re- <br />;uirements. <br />January 1, 1989 <br />signature Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.